Dresden/Münchenstein, 23. May 2016 – aventron has acquired the 18 MW wind park Melfi II located in the Basilicata region from the WSB group. Aventron strengthens its presence in its southern neighbor country and deepens its relationship with WSB.
The wind park Melfi II was built in 2015 and is located in a high wind area 100 km west of Bari. Consisting of nine Vestas V110 turbines, the project is expected to produce 42 GWh annually and generate 4.8 MEUR in annual revenues. This project is the third wind park aventron acquires from the WSB group. With this participation aventron substantially grows both its Italian business as well as its wind energy unit. aventron operates today 14 MW in solar power plants in Italy.